417
edits
Chalochatu (talk | contribs) No edit summary Tags: Mobile edit Mobile web edit |
Chalochatu (talk | contribs) No edit summary Tags: Mobile edit Mobile web edit |
||
Line 13: | Line 13: | ||
On 16 September 2022, TAZARA announced the re-opening of the bridge and traffic between Zambia and Tanzania resumed.<ref>[https://www.tazarasite.com/chambeshi-railway-bridge-now-open-traffic Chambeshi Railway Bridge now open to traffic], 16 September 2022, TAZARA</ref> | On 16 September 2022, TAZARA announced the re-opening of the bridge and traffic between Zambia and Tanzania resumed.<ref>[https://www.tazarasite.com/chambeshi-railway-bridge-now-open-traffic Chambeshi Railway Bridge now open to traffic], 16 September 2022, TAZARA</ref> | ||
==Bridge data== | |||
*Length - 240m | |||
*Width: 4.4m | |||
*River width at point of bridge crossing - 96m (almost the length of a football pitch) | |||
*River’s deepest point under the bridge- 3.5m | |||
==References== | ==References== |
edits