Chambeshi Railway Bridge: Difference between revisions

From Chalo Chatu, Zambia online encyclopedia
No edit summary
Tags: Mobile edit Mobile web edit
No edit summary
Tags: Mobile edit Mobile web edit
Line 13: Line 13:


On 16 September 2022, TAZARA announced the re-opening of the bridge and traffic between Zambia and Tanzania resumed.<ref>[https://www.tazarasite.com/chambeshi-railway-bridge-now-open-traffic Chambeshi Railway Bridge now open to traffic], 16 September 2022, TAZARA</ref>
On 16 September 2022, TAZARA announced the re-opening of the bridge and traffic between Zambia and Tanzania resumed.<ref>[https://www.tazarasite.com/chambeshi-railway-bridge-now-open-traffic Chambeshi Railway Bridge now open to traffic], 16 September 2022, TAZARA</ref>
==Bridge data==
*Length - 240m
*Width: 4.4m
*River width at point of bridge crossing - 96m (almost the length of a football pitch)
*River’s deepest point under the bridge- 3.5m


==References==
==References==