(Created page with "Zambia has five large power stations, of which four are hydroelectric and one is thermal. A fifth hydroelectric power plant...") |
|||
Line 179: | Line 179: | ||
== References == | == References == | ||
{{reflist}} | {{reflist}} | ||
[[Category:Lists of power stations by country|Zambia]] | [[Category:Lists of power stations by country|Zambia]] | ||
[[Category:Power stations in Zambia| ]] | [[Category:Power stations in Zambia| ]] | ||
[[Category:Lists of buildings and structures in Zambia|Power stations]] | [[Category:Lists of buildings and structures in Zambia|Power stations]] |
Latest revision as of 12:59, 6 July 2016
Zambia has five large power stations, of which four are hydroelectric and one is thermal. A fifth hydroelectric power plant is under construction at Itezhi-Tezhi Dam (120MW) along with a coal powered power station at Maamba (300MW) as of 2015. There are also a number of smaller hydroelectric stations, and eight towns not connected to the national power transmission grid are served by diesel generators.
In 2014 the combined power generation from an installed capacity of 2,396MW was 14,453GWh, of which 91.2% came from hydroelectric plants.[1]
The majority of the plants are owned and operated by ZESCO, the national power utility.
Hydroelectric
Operational
Station | Capacity (MW) | Generation 2014 (GWh) | Type | Owner | Notes |
---|---|---|---|---|---|
Kafue Gorge Upper | 900 | 6,666 | dam | ZESCO | |
Kariba North Bank | 600 | 4,999 | dam | ZESCO | |
Kariba North Bank Extension | 360 | 1,162 | dam | ZESCO | Peaking plant |
Itezhi-Tezhi | 120 | dam | ZESCO | ||
Victoria Falls | 108 | 811 | run-of-river | ZESCO | |
Mulungushi | 32 | 198.2 | dam | LHPC (SN Power) | |
Lunsemfwa | 24 | 98.8 | dam | LHPC (SN Power) | |
Lunzua | 14.8 | 3.52 | run-of-river | ZESCO | Upgraded from 0.75MW to 14.8MW in 2015 |
Lusiwasi | 12 | 58.69 | dam | ZESCO | |
Chishimba Falls | 6 | 23.68 | run-of-river | ZESCO | |
Musonda Falls | 5 | 20.47 | run-of-river | ZESCO | |
Shiwa Ngandu | 1 | 0.71 | run-of-river | ZESCO | |
Zengamina | 0.7 | run-of-river | Zengamina | Off-grid |
Thermal
Operational
Station | Capacity (MW) | Generation 2014 (GWh) | Fuel | Owner | Notes |
---|---|---|---|---|---|
Ndola HFO | 50 | 393.4 | HFO | Ndola Energy Company | |
Zambezi | 2.35 | 2.5 | diesel | ZESCO | off-grid |
Kabompo | 1.55 | 3.01 | diesel | ZESCO | off-grid |
Mwinilunga | 1.5 | 3 | diesel | ZESCO | off-grid |
Lukulu | 1.5 | 2.33 | diesel | ZESCO | off-grid |
Luangwa | 1.5 | 2.64 | diesel | ZESCO | off-grid |
Shangombo | 1 | 0.74 | diesel | ZESCO | off-grid |
Chavuma | 1 | 1.06 | diesel | ZESCO | off-grid |
Mufumbwe | 0.9 | 2.06 | diesel | ZESCO | off-grid |
Nakambala | 40 | biomass | Zambia Sugar |
Under construction
Station | Capacity (MW) | Fuel | Owner | Status |
---|---|---|---|---|
Maamba | 300 | coal | Maamba Collieries Limited | Commissioning 2015-2016 |