Search results
From Chalo Chatu, Zambia online encyclopedia
- | r1-surface = [[Concrete]] | r2-surface = [[Concrete]]4 KB (521 words) - 16:29, 17 October 2017
- ...l girder truss bridge of 13 spans each of {{convert|33|m|ft}} supported on concrete piers. It was built for Mashonaland Railways, later merged into Rhodesian R2 KB (230 words) - 12:10, 1 December 2016
- ...e border of [[Zambia]] and Zimbabwe, Africa. In 1959 the large double arch concrete [[Kariba Dam]] was completed, completely filling the gorge and creating the2 KB (301 words) - 16:04, 14 July 2016
- ...ent of Zambia's anti-trafficking law enforcement efforts have not achieved concrete results; prosecutions of trafficking crimes have not occurred, as police an6 KB (857 words) - 20:49, 8 July 2016
- Kapenta is usually dried in the sun on a clean surface such as concrete slabs, rocks or netting. Drying on racks gives the best results.<ref>{{cite6 KB (949 words) - 13:58, 6 June 2018
- The double curvature concrete arch dam was designed by Coyne et Bellier and constructed between 1955 and15 KB (2,087 words) - 14:58, 2 August 2016
- * Sleepers: [[Concrete sleeper|Concrete]] on main line, [[Railroad tie#Wooden|Wood]] at turnouts and on bridges.<re45 KB (6,585 words) - 14:40, 30 November 2016
- ...e country in general. He also produced a huge sculpture of a bird (work in concrete) at the Kapiri Mposhi railway station - the terminus end of the mid-seventi30 KB (4,640 words) - 15:13, 2 August 2016